info@gm-impianti.it
EW WAREHOUSE AND FUTURE PRODUCTION UNIT PISTICCI. Warehouse requalification to create an area dedicated to the storage of raw materials, one for the sampling of incoming products and one dedicated to the dispensing of raw materials for production.
Realization of fire prevention system, lighting system, Hvac system
Executive design of fire-fighting system, hydrants and sprinklers
Design of fire detection system
Partial design of electrical system for fire fighting requalification
Direction of works for the above designs including reports VVF
Executive design of electrical system: cabin, panels, lights, sockets, grounding
Test and calibration of air conditioning systems
COMMISSIONING air conditioning systems
DESIGN air conditioning systems